The Cairo Oil Refining Company is a giant company in the field of petroleum refining within the Arab Republic of Egypt, which is affiliated with the Egyptian General Petroleum Corporation.
The scope of its work is not limited to refining only, but it has become a pioneering role within the Egyptian General Petroleum Corporation through its presence at the level of manufacturing projects for itself and for its sister companies.
Within the Egyptian petroleum sector, the projects it delivers have become turnkey projects (Supply, installation and operation)



Avatar

CPC

Construction of an 8-inch diameter pipeline, 42 kilometers per month, from the warehouse to the Fayed Air Base

Avatar

Armed Forces

Replacement and renewal of the Mostorod-Hixstep water line

Avatar

ESHPETCO

Establishment of an oils processing unit


Avatar

MAGAPETCO

Manufacture of salt separation unit

Avatar

ASORC

Supply, manufacture and test air cooler packages for air coolers

Avatar

APC

Supply, installation and operation of a continuous self-monitoring system for furnace stack emissions


Avatar

SOPC

Empty, sift, and refill the platinum catalyst

Avatar

SOPC

Supply, manufacture and installation of main tower trays in the distillation unit 2

Avatar

PetroBel

Engineering inspection and repair of 2 salt separators, Nos. 3 and 4, in the Petrico fields in Sinai.


Avatar

Agiba

Manufacturing and supplying 13 filters

Avatar

PPC

Reviewing the technical specifications and supervising the installation, testing for 3 diesel heating furnaces within the Port Said/Suez project.

Avatar

Gupco

Repairing the heater pipe package(101 GH1-A) in Ras Bakr fields


Avatar

PetroBel

Supply and manufacture of 2 air cooler packages in the Nile Delta fields

Avatar

Gupco

Supply and manufacture of 4 air cooler packages at Ras Shuqair site

Avatar

Gasco

Rehabilitation of furnaces(20-H-1/20-H-2/20-H-4) at the Western Desert Gas Complex site


Avatar

CPC

Construction of an 8-inch diameter pipeline, 42 kilometers per month, from the warehouse to the Fayed Air Base

Avatar

Armed Forces

Replacement and renewal of the Mostorod-Hixstep water line

Avatar

ESHPETCO

Establishment of an oils processing unit


Avatar

MAGAPETCO

Manufacture of salt separation unit

Avatar

ASORC

Supply, manufacture and test air cooler packages for air coolers

Avatar

APC

Supply, installation and operation of a continuous self-monitoring system for furnace stack emissions


Avatar

SOPC

Empty, sift, and refill the platinum catalyst

Avatar

SOPC

Supply, manufacture and installation of main tower trays in the distillation unit 2

Avatar

PetroBel

Engineering inspection and repair of 2 salt separators, Nos. 3 and 4, in the Petrico fields in Sinai.


Avatar

Agiba

Manufacturing and supplying 13 filters

Avatar

PPC

Reviewing the technical specifications and supervising the installation, testing for 3 diesel heating furnaces within the Port Said/Suez project.

Avatar

Gupco

Repairing the heater pipe package(101 GH1-A) in Ras Bakr fields


Avatar

PetroBel

Supply and manufacture of 2 air cooler packages in the Nile Delta fields

Avatar

Gupco

Supply and manufacture of 4 air cooler packages at Ras Shuqair site

Avatar

Gasco

Rehabilitation of furnaces(20-H-1/20-H-2/20-H-4) at the Western Desert Gas Complex site