Construction of an 8-inch diameter pipeline, 42 kilometers per month, from the warehouse to the Fayed Air Base
Replacement and renewal of the Mostorod-Hixstep water line
Establishment of an oils processing unit
Manufacture of salt separation unit
Supply, manufacture and test air cooler packages for air coolers
Supply, installation and operation of a continuous self-monitoring system for furnace stack emissions
Empty, sift, and refill the platinum catalyst
Supply, manufacture and installation of main tower trays in the distillation unit 2
Engineering inspection and repair of 2 salt separators, Nos. 3 and 4, in the Petrico fields in Sinai.
Manufacturing and supplying 13 filters
Reviewing the technical specifications and supervising the installation, testing for 3 diesel heating furnaces within the Port Said/Suez project.
Repairing the heater pipe package(101 GH1-A) in Ras Bakr fields
Supply and manufacture of 2 air cooler packages in the Nile Delta fields
Supply and manufacture of 4 air cooler packages at Ras Shuqair site
Rehabilitation of furnaces(20-H-1/20-H-2/20-H-4) at the Western Desert Gas Complex site